How We Work

The Process

  • Before Project

    We will meet and discuss the following aspects of your job:

    • Access
    • Parking
    • Keys, access cards
    • Alarm system, smoke alarms
    • OHS issues on site – electrical wires, children
    • Are there to be any changes or variations to the original scope
  • During Project

    When the work commences:

    • On the first day we will re-check the scope and confirm above arrangements
    • Site will be left clean and tidy at the end of every day
    • Keys, access cards
    • Gear will remain on site during the duration of the project
  • After Project

    After the project is complete:

    • We will ask you to inspect the work to confirm that all work has been satisfactorily completed
    • The site will be left clean and tidy
    • All access keys/swipe cards will be left in an agreed upon location
    • We will provide touch up paint
    • We will provide you with a suggested maintenance plan

Workmanship

  • Preparation

    • All surfaces will be correctly prepared and adjacent surfaces will be protected with drop sheets or plastic.
    • Surfaces to be painted will be cleaned, sanded, with failed coatings removed, holes filled and cracks caulked.
    • Mould and rust will be treated prior to painting.
    • Water stains and damage will be sealed.
    • Water damage will be treated on the visible surface; no guarantee is given that the water damage will not reoccur unless the work scope includes exterior waterproofing of the area.
    • Cracks are caused by movement in the painted structure and therefore they may reoccur.
  • Painting

    • Toms painting servise use a three coat system: a full undercoat on raw substrate and two top coats.
    • All paints used are premium paints.
    • The painting will be a fully opaque coating, with minimal and consistent application marks, clean edges and sharp corners.

Preparation and painting is as per Australian Standards 2311:2009

Looking for a First-Class Business Plan Consultant?

Scroll Up