The Process
-
Before Project
We will meet and discuss the following aspects of your job:
- Access
- Parking
- Keys, access cards
- Alarm system, smoke alarms
- OHS issues on site – electrical wires, children
- Are there to be any changes or variations to the original scope
-
During Project
When the work commences:
- On the first day we will re-check the scope and confirm above arrangements
- Site will be left clean and tidy at the end of every day
- Keys, access cards
- Gear will remain on site during the duration of the project
-
After Project
After the project is complete:
- We will ask you to inspect the work to confirm that all work has been satisfactorily completed
- The site will be left clean and tidy
- All access keys/swipe cards will be left in an agreed upon location
- We will provide touch up paint
- We will provide you with a suggested maintenance plan


Workmanship
-
Preparation
- All surfaces will be correctly prepared and adjacent surfaces will be protected with drop sheets or plastic.
- Surfaces to be painted will be cleaned, sanded, with failed coatings removed, holes filled and cracks caulked.
- Mould and rust will be treated prior to painting.
- Water stains and damage will be sealed.
- Water damage will be treated on the visible surface; no guarantee is given that the water damage will not reoccur unless the work scope includes exterior waterproofing of the area.
- Cracks are caused by movement in the painted structure and therefore they may reoccur.
-
Painting
- Toms painting servise use a three coat system: a full undercoat on raw substrate and two top coats.
- All paints used are premium paints.
- The painting will be a fully opaque coating, with minimal and consistent application marks, clean edges and sharp corners.
Preparation and painting is as per Australian Standards 2311:2009